MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Marcos inspects rock shed project in Benguet
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://ycyzqzxyh.com
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”

“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.
- OVP ready to submit to lifestyle check if ordered, no word from Sara
- French couple kept panther that roamed nearby rooftops
- Nepali court: Hindu holy men's nudity not obscene
- Japan accelerates missile deployment amid rising regional tensions
- NKorea could produce ten to twenty nukes per year — SKorea leader
- Pagasa sees cyclone-free week across PH
- House panel defers 2026 DPWH budget until agency submit changes
- MMDA inks deal with DBM for G-3 program
- Pasig police prepare charges vs protesters
- Protesters storm Discaya office in Pasig to demand accountability for 'ghost flood control projects'